Información comercial
Cantidad mínima de pedido: 25mts
Precio: Negociar
Método de pago: 30% t / t por adelantado, 70% saldo contra copia b / l
Capacidad de suministro: 6000mts / mes
Período de entrega: 15-20 dias
Embalaje Regular: 1En la fundición de hierro
Descripción del producto
When introducing this products, some salesmen often misleading the customers deliberately or inadvertently by saying that it is a newly designed product or a slag. Actually it is a by product comes from silicon metal plant. It deposits on the bottom of the melting furnace, and has to be cleaned out in months interval. But with technological development, the interval has prolonged from three months to six months. So the output of this product is limited. We collect and select this product from bigger Silicon metal factories all around China.
Especificación
En la fundición de hierro | En la fundición de hierro(%) | ||||||
En la fundición de hierro | C | fe | Alabama | California | En la fundición de hierro | En la fundición de hierro | |
≥ | En la fundición de hierro | ||||||
H-C Silicon Lump | 68 | 18 | 1.5 | 1.5 | 2.0 | 0.05 | 0.04 |
Typical Analysis | 70 | 22 | 0.7 | 0.5 | 0.6 | 0.005 | 0.005 |
H-C Silicon | 65 | 15 | 1.5 | 1.5 | 2.0 | 0.05 | 0.04 |
En la fundición de hierro: 0-5En la fundición de hierro, 3-10En la fundición de hierro, 10-50En la fundición de hierro, 50-100mm or as your demand. |
Solicitud
It is main used in foundries. As you know the cast iron contain C: 2-4%, En la fundición de hierro: 1-3%, and Carbon and silicon are the main elements affecting the microstructure of cast iron.High Carbon Silicon has made carbon alloyed in it, so it can provide the two elements effectively. Lately it also be used in steel making, especially steel scraps melting. It serves as deoxidizer and efficient heating agent (En la fundición de hierro&C: 6.58kcal/g, 1.24kcal/g each) and recarburizer. With Si&C at least 90%, the impurity is very less, so the input is easy to control.
En la fundición de hierro: 1MT big bag or as per customer request
Pago: LC at sight or T/T
En la fundición de hierro: Within two weeks after workable payment